Whole-House Remodel in the Twin Cities
Multi-room and full-home remodels under one contract. When two rooms is not enough. Single-contract whole-house renovation.
Whole-house remodels for Twin Cities homes. Multi-room kitchen + bath + living combinations, open-concept conversions, second-story additions, and historic-home modernizations. Single project manager, single fixed-price contract, every trade coordinated.
What's included
- ✓Multi-room scope: kitchens, baths, living spaces, basements
- ✓Open-concept wall removal with structural engineering
- ✓Second-story additions or pop-tops
- ✓MEP rough-in (plumbing, electrical, HVAC)
- ✓Drywall, insulation, paint throughout
- ✓Trim, doors, finish carpentry across the home
- ✓Permits and inspections under one contract
- ✓Single project manager from start to finish
- ✓Coordination with structural engineers and architects as needed
Whole-House Remodel cost ranges (2026, Twin Cities)
Our process
- 1DiscoveryFull walk-through, scope identification, structural feasibility check.
- 2Design + scopeDesign drawings, engineering review for structural changes, finish selections, fixed-price quote.
- 3Pre-constructionPermits pulled, materials ordered, sub trades scheduled, demo plan set.
- 4ConstructionSingle on-site project manager, weekly status meetings, daily clean-up, sequenced trade scheduling.
- 5Close-outFinal inspections, full punch list, warranty paperwork, care instructions.
Whole-House Remodel FAQs
Do I need an architect for a whole-house remodel?+
If the project involves structural changes (removing load-bearing walls, second-story additions, foundation work), yes. For straightforward multi-room remodels without structural reconfiguration, a designer is usually sufficient. We work with several Twin Cities architects and can recommend one.
Can I live in my home during a whole-house remodel?+
Sometimes. If we can phase the work room by room, yes. For full-floor gut renovations or projects with major HVAC/electrical work, most homeowners move out for 8-16 weeks. We help plan the phasing and temporary housing logistics during pre-construction.
How long does a whole-house remodel take?+
Two-room scope projects run 12-20 weeks on-site. First-floor conversions run 16-28 weeks. Full whole-home gut renovations run 6-14 months depending on scope. Add 4-12 weeks of design + material lead time before construction starts.
What is the markup on a whole-house remodel?+
Reputable Twin Cities general contractors charge a 15-25% overhead and profit margin on top of direct cost. On a $300,000 whole-house remodel, that means roughly $45,000-$75,000 of the total goes to project management, insurance, warranty, and overhead. Lower than that range typically means corners are being cut.
Get a free whole-house remodel quote
Most quotes delivered within 48 hours. Serving the entire Twin Cities metro.
Get a Free Quote