Full Gut Renovations in the Twin Cities
Single-contract full-home renovations. When you're starting from scratch — we manage every trade under one roof.
Full gut renovations of kitchens, bathrooms, and multi-room projects. Single contract, single project manager, all trades coordinated. Includes demo, structural work, MEP rough-in, drywall, and full finish.
What's included
- ✓Demolition and disposal
- ✓Structural changes (wall removal, beams)
- ✓Plumbing rough-in and finish
- ✓Electrical rough-in and finish
- ✓HVAC adjustments
- ✓Drywall, insulation, paint
- ✓Cabinets, counters, tile
- ✓Trim, doors, finish hardware
- ✓Permits and inspections under one number
Full Gut Renovations cost ranges (2026, Twin Cities)
Our process
- 1DiscoveryWe walk the project, identify scope, and discuss must-haves.
- 2Design + scopeDetailed scope of work, drawings, finish selections, fixed-price quote.
- 3Pre-constructionPermits pulled, materials ordered, trades scheduled, start date set.
- 4ConstructionSingle on-site project manager coordinates all trades. Weekly status meetings.
- 5Close-outFinal inspections, punch list, warranty paperwork, care instructions.
Full Gut Renovations FAQs
Do I need an architect for a gut renovation?+
If you're removing structural walls or significantly changing layouts, yes — you'll need engineered plans for the permit. We work with several local architects and can recommend one, or work with your existing architect. For straightforward gut renovations without structural changes, a designer is usually sufficient.
How long does a full gut take?+
A two-room (kitchen + bath) gut typically runs 12–16 weeks of on-site work. A first-floor gut with open-concept conversion is usually 16–24 weeks. Whole-home gut renovations are 6–12 months depending on scope.
Get a free full gut quote
Most quotes delivered within 48 hours. Serving the entire Twin Cities metro.
Get a Free Quote