Kitchen Remodeling in the Twin Cities
Custom kitchen renovations for Twin Cities homes. From cosmetic refreshes to full gut renovations β built right, on schedule.
Full-service kitchen remodeling for homeowners across the MinneapolisβSaint Paul metro. We handle layout planning, demo, plumbing rough-in, electrical, drywall, cabinets, counters, backsplash, flooring, and appliance installation under one contract.
What's included
- βIn-home consultation and design
- βDetailed scope and fixed-price quote
- βPermit pulling and city inspections
- βDemo and disposal
- βPlumbing and electrical rough-in
- βCustom or semi-custom cabinetry
- βCountertop fabrication and installation
- βTile backsplash
- βHardwood, LVP, or tile flooring
- βAppliance installation and gas hookups
- βFinal punch list and walk-through
Kitchen Remodeling cost ranges (2026, Twin Cities)
Our process
- 1Free consultation30β60 minutes in your home. We measure, listen, and identify your must-haves vs. nice-to-haves.
- 2Design + quoteWithin 5β10 business days you receive design concepts, finish samples, and a detailed, itemized fixed-price quote.
- 3Contract + schedulingSigned contract, materials ordered, project start date locked in. Most kitchens have a 4β10 week material lead time depending on cabinets.
- 4ConstructionDaily on-site project manager. Demo through final install typically takes 4β10 weeks once materials arrive. Daily clean-up. Weekly status updates.
- 5Final walk-throughWe walk the kitchen with you, address every punch-list item, and provide care instructions and warranty paperwork.
Kitchen Remodeling FAQs
How long does a kitchen remodel take?+
Most kitchen remodels take 6β12 weeks of on-site work, plus 4β10 weeks of design and material lead time. Full custom cabinetry can push the timeline to 14β16 weeks total. We hand you a calendar with milestones at contract signing.
Can I live in my home during a kitchen remodel?+
Yes β most clients do. We seal the work area with plastic, set up a temporary kitchen (microwave, fridge, induction burner) in another room, and clean up daily. If you're doing a full gut with structural changes, expect 2β4 weeks where the space is unusable.
Do I need permits?+
Almost certainly. Any kitchen work involving plumbing relocation, new electrical circuits, structural changes (wall removal), or projects over $1,000β$5,000 (varies by city) requires a permit. We pull all permits and manage inspections.
Will you work with my designer or architect?+
Absolutely. We collaborate regularly with kitchen designers, interior designers, and architects. We can also handle full design in-house if you don't already have a designer.
Kitchen Remodeling by city
We serve the entire Twin Cities metro. Find detailed pricing and local information for your city:
Get a free kitchen remodel quote
Most quotes delivered within 48 hours. Serving the entire Twin Cities metro.