Kitchen and Bathroom Remodeling in Bloomington, MN: Costs and What to Expect (2026)

Bloomington kitchen and bathroom remodeling costs in 2026: kitchen refresh $16K–$40K, gut remodel $45K–$85K, bathroom remodel $12K–$36K. What to expect remodeling a 1950s or 1960s rambler or split-level, from galley kitchen openings to original tile tear-outs.

·8 min read·Minneapolis Kitchen & Bath team

Bloomington Remodeling Cost Summary (2026)

Kitchen Refresh
$16,000–$40,000
Cabinet repaint, quartz counters, new fixtures and hardware — keeps the existing layout
Kitchen Gut Remodel
$45,000–$85,000
Full cabinet replacement, wall removal, appliances, flooring, lighting, plumbing
Bathroom Remodel
$12,000–$36,000
Tile, vanity, shower or tub surround, fixtures; per bathroom

Why Bloomington Remodels Start with a Wall Conversation

Bloomington was built during the post-war housing boom. A large share of its homes date from the 1950s and 1960s — ramblers and split-levels with compartmentalized floor plans, small galley kitchens, and bathrooms sized for the era. That housing stock creates a specific kind of remodel question that does not come up as often in Plymouth or Eden Prairie: can we remove a wall?

In a 1958 Bloomington rambler, the kitchen is often a separate room at the back of the house. It is functional, but isolated. Opening it to the family room or dining area requires determining whether the wall between them is load-bearing. In Bloomington homes from this era, it frequently is. That means a structural beam, a post, and a permit — but it also means the result is a genuinely different house. The open-concept kitchen remodel is the single most transformative project we do in Bloomington.

Kitchen Remodeling in Bloomington: The Galley Kitchen Problem

The galley kitchen — two runs of cabinets facing each other, no island — works fine for one person cooking. It does not work well for how most families use a kitchen today. Bloomington homeowners have two options when the galley becomes the problem: open the wall, or optimize the galley.

Opening the Wall ($8,000 to $18,000 for structural work alone)

Removing a load-bearing wall between a Bloomington kitchen and an adjacent room requires an engineered beam, temporary shoring during construction, new posts or columns at the beam ends, and patching of the floor, ceiling, and any relocated plumbing or electrical. The structural work alone runs $8,000 to $18,000 depending on span length and what is buried in the wall. That cost is separate from the kitchen remodel itself.

For a deeper look at what this project involves, see our open-concept kitchen remodel guide.

Optimizing the Galley ($16,000 to $40,000)

If the wall stays, the best Bloomington galley refreshes focus on light and storage. New upper cabinet doors with glass inserts, undercabinet LED lighting, and lighter paint colors open a galley visually without touching the structure. Combined with quartz countertops and a new sink and faucet, a galley refresh at $16,000 to $25,000 produces a kitchen that looks current even if the layout has not changed.

Full cabinet replacement in a galley kitchen — new semi-custom boxes, doors, quartz counters, and new appliances — runs $40,000 to $55,000 in Bloomington. Because the layout stays the same, there is no structural work and the permit scope is limited to plumbing and electrical.

Full Gut Remodel with Layout Change ($55,000 to $85,000)

When the wall comes out and the kitchen gets fully rebuilt, costs run $55,000 to $85,000 in Bloomington. That range covers structural work, new semi-custom or custom cabinets, an island if the new footprint supports it, quartz countertops, new appliances, flooring throughout the combined space, and lighting. Labor in Hennepin County runs $75 to $110 per hour for experienced remodelers.

Bloomington Building and Inspections issues all permits. For a kitchen remodel with plumbing, electrical, and structural components, expect permit fees of $600 to $1,200 and a plan review turnaround of 5 to 10 business days. Inspections are typically scheduled within 2 to 3 days of request.

Bathroom Remodeling in Bloomington: The Original 1960s Tile

Bloomington homes from the 1950s and 1960s frequently still have their original bathrooms: pink, avocado green, or powder-blue ceramic tile in 4x4 subway patterns with decorative accent rows, pedestal sinks, and cast-iron tubs. Some of these bathrooms are still in good structural condition — the tile is intact, the drain lines are clear, and the plumbing valves still work. The decision is cosmetic versus functional.

If the original tile has no major cracks and the tub is sound, a cosmetic update — new vanity, new fixtures, fresh paint, and a reglazing of the tub and tile — can run as little as $4,000 to $8,000 and still produce a significant visual change. Reglazing buys 10 to 15 years on original fixtures that would cost far more to replace.

If the original tile has failed grout, cracked mortar bed, or soft spots in the substrate, a full tear-out is the right move. At that point, you are rebuilding from the studs and there is no cost advantage to preserving any of the original material.

Full Bathroom Tear-Out and Rebuild ($18,000 to $36,000)

A full bathroom remodel in a Bloomington split-level or rambler typically covers a hall bath or a primary bath. Costs depend on whether the layout changes, the tile selection, and whether a shower is being added where there was only a tub. A standard rebuild with new porcelain tile, a 36-inch vanity, new toilet, and either a tub surround or a tiled shower runs $18,000 to $28,000. Adding a curbless shower with a linear drain and full-height tile pushes the cost to $28,000 to $36,000.

Heated floors are a practical addition in any Minnesota bathroom, and they are straightforward to add during a full tear-out. See our heated floor cost guide for typical costs and system options.

Adding a Bathroom to a Bloomington Rambler

Many 1950s and 1960s Bloomington ramblers were built with only one full bathroom. Adding a second bathroom — typically in the basement or by converting a bedroom closet — is one of the most common requests we get from Bloomington homeowners. A new full bath in a finished basement runs $22,000 to $42,000 depending on plumbing rough-in distance, ceiling height, and finish level. A half-bath addition in a smaller footprint runs $12,000 to $22,000.

Bloomington Permit Requirements

Bloomington Building and Inspections (BID) handles all residential permits. Kitchen and bathroom remodels that involve plumbing, electrical, or structural work require a building permit. There is no heritage preservation overlay in Bloomington, so there are no additional reviews for exterior-visible changes.

One Bloomington-specific consideration: homes in the Minnesota Valley National Wildlife Refuge corridor and near Hyland Lake Park Reserve may be subject to floodplain or shoreland zoning restrictions. If your home is within 1,000 feet of a water body, verify with BID before scoping any exterior additions or drainage modifications.

Finding a Contractor for a Bloomington Remodel

The southern metro has a strong pool of remodeling contractors, but the range of quality and licensing is wide. Minnesota requires a licensed residential contractor for any project over $15,000 or that involves mechanical systems. Verify any contractor's license with the Minnesota Department of Labor and Industry (DLI) before signing a contract.

In Bloomington, ask specifically whether the contractor has experience with post-war construction. Load-bearing wall removal in a 1950s rambler involves details that differ from newer construction: there may be no interior sheathing, wiring may not be grounded, and supply lines are likely galvanized rather than copper or PEX. A contractor who has only worked in newer suburbs may not price these conditions accurately.

Get at least three quotes and make sure each one addresses the structural scope in writing if a wall is being removed. A quote that leaves wall removal as a line-item allowance is not a firm price — the actual cost can differ by $5,000 or more depending on what the wall contains.

How Bloomington Remodel Costs Compare to the Rest of the Metro

Bloomington sits in the mid-range of Twin Cities suburb remodeling costs. Labor rates match the rest of Hennepin County. Finish expectations have been rising as home values in Penn Lake, West Bloomington, and East Bloomington have pushed toward $350,000 to $450,000 for larger ramblers and split-levels.

The biggest cost driver unique to Bloomington is structural work. Because of the older housing stock, a higher share of Bloomington kitchen remodels involve load-bearing wall removal compared to suburbs built after 1980. If your project includes opening up a floor plan, budget $8,000 to $18,000 on top of the kitchen cost estimate before any cabinets or countertops are selected.

See our kitchen remodel ROI guide for Twin Cities resale data by project type.

Get a Quote for Your Bloomington Kitchen or Bathroom

We work throughout the south and southwest metro, including Bloomington, Richfield, Edina, and Hopkins. If you are planning a kitchen or bathroom remodel in Bloomington and want a realistic cost estimate for your specific house and scope, use the quote form on this site. We respond within one business day and can meet at your home for projects in the Bloomington area.

For a starting point on costs, use our kitchen remodel cost guide or our bathroom remodel cost guide. Both are written for Twin Cities market conditions and apply directly to Bloomington projects.

Get a Free Quote for Your Project

Serving Minneapolis, St. Paul, Edina, Minnetonka, Eden Prairie & the entire Twin Cities metro. Most quotes delivered within 48 hours.

Request a Free Quote

FAQ

Frequently Asked Questions

How much does a kitchen remodel cost in Bloomington, MN?+

A kitchen refresh (cabinet repaint, new countertops, hardware) runs $16,000 to $40,000. A full gut remodel with wall removal, new cabinets, appliances, and flooring runs $45,000 to $85,000 in Bloomington.

Do I need a permit for a kitchen remodel in Bloomington?+

Yes. Bloomington Building and Inspections (BID) issues permits for any kitchen or bathroom work involving plumbing, electrical, or structural changes. For structural work like load-bearing wall removal, allow 5 to 10 business days for plan review.

Can I remove a load-bearing wall in my Bloomington rambler?+

Yes, but it requires an engineered beam, permits, and proper shoring during construction. In a typical 1950s Bloomington rambler, the wall between the kitchen and family room is often load-bearing. Structural work alone runs $8,000 to $18,000 on top of the kitchen remodel cost.

How much does a bathroom remodel cost in Bloomington, MN?+

A full bathroom tear-out and rebuild in Bloomington runs $18,000 to $36,000 depending on tile selection, shower type, and whether the layout changes. A cosmetic update with reglazing and new fixtures can run $4,000 to $8,000 if the original tile and tub are structurally sound.

Want the numbers first?

Get the free 2026 Twin Cities Remodel Cost Guide by email: kitchen and bath price tiers, plus how your Twin Cities suburb changes the number.

Ready to start your remodel?

Free in-home consultation. Detailed fixed-price quotes.

Get a Free Quote