Bathroom Remodeling in Hopkins, MN

Powder rooms, family baths, primary suites — we remodel them all.

Bathroom remodels for Hopkins homeowners — from cramped 1950s hall baths to luxury primary suites. Hopkins has a tight stock of historic small homes — many on 50-foot lots downtown. Kitchen remodels often have to work within tight floor plans where wall removal between kitchen and dining is the single biggest impact change.

Full bathroom remodels for homes throughout the Minneapolis metro. We specialize in tile showers, freestanding tubs, double vanities, and layout reconfigurations that turn cramped bathrooms into functional spaces.

What's Included in a Hopkins Bathroom Remodel

  • In-home consultation and 3D design
  • Permit pulling and inspections
  • Demo and disposal
  • Plumbing and electrical updates
  • Custom tile shower or tub surround
  • Vanity, mirror, and lighting install
  • Fixture and faucet installation
  • Heated floor systems (optional)
  • Tile, LVP, or stone flooring
  • Final punch list and warranty

Hopkins Bathroom Remodel Cost Ranges (2026)

Real pricing tiers based on actual Hopkins-area projects. Hopkins's median home value of $320,000 supports the mid-range tier most commonly.

Powder room / half bath
$8,000–$18,000
New vanity, toilet, fixtures, flooring, lighting. No tile shower.
Full hall bath
$18,000–$45,000
Tub-to-shower conversion or new tile surround, vanity, toilet, fixtures, tile floor, lighting.
Primary suite bathroom
$45,000–$100,000+
Custom tile shower, freestanding tub, double vanity, separate WC, premium fixtures, heated floors.

Our Process

  1. 1
    Free consultation
    We measure the space, discuss layout options, and walk through inspirations.
  2. 2
    Design + quote
    3D renderings, finish samples, and a detailed fixed-price quote within 5–10 business days.
  3. 3
    Contract + scheduling
    Materials ordered, start date locked. Most bathrooms have 2–4 weeks material lead time.
  4. 4
    Construction
    Bathroom remodels typically take 3–6 weeks on-site. Daily clean-up, plastic isolation, weekly progress updates.
  5. 5
    Final walk-through
    Punch list, warranty paperwork, fixture and tile care instructions.

About Remodeling in Hopkins

Neighborhoods we serve in Hopkins

Downtown Hopkins, Interlachen Park, Knollwood, Westbrooke — covering ZIP codes 55305, 55343.

Typical Hopkins homes

1920s craftsmans, 1940s bungalows, 1960s ramblers, newer townhomes near downtown.

Hopkins permit notes

Hopkins Inspections & Facilities issues remodel permits. Smaller city means faster permit review than Minneapolis or Edina — often 5–7 business days. Hopkins permit office →

Hopkins Bathroom Remodel FAQs

How long does a bathroom remodel take?+

Powder rooms take 1–2 weeks. Hall bathrooms take 3–4 weeks. Primary suite bathrooms with custom tile work take 4–6 weeks of on-site work. Add 2–4 weeks of material lead time before construction starts.

What does a bathroom remodel actually cost in Hopkins?+

In the Hopkins metro in 2026, expect $8,000–$18,000 for a powder room refresh, $18,000–$45,000 for a full hall bathroom, and $45,000–$100,000+ for a primary suite bathroom with custom tile and premium fixtures.

Can you convert my tub to a walk-in shower?+

Yes — tub-to-shower conversions are one of our most common bathroom projects in the Hopkins. Expect $8,000–$15,000 for a basic tub-to-shower swap with a fiberglass surround, $15,000–$30,000+ for a fully tiled walk-in shower with niche, bench, and frameless glass.

Will you waterproof the shower properly?+

Every tile shower we build uses a proper waterproofing system — either Schluter-Kerdi or RedGard liquid membrane — over cement board or foam panels. We don't use the green drywall and mortar method (which is how most leaky showers were built before 2010).

Ready to start your Hopkins bathroom remodel?

Free in-home consultation and quote. Most Hopkins quotes delivered within 48 hours.

Get a Free Quote